SAI Industrial ConsultantBusiness Consultant · Vadodara Start a Conversation
  1. Home
  2. Services
  3. Production & Planning Systems

Production planning consultant in VadodaraProduction & Planning Systems

In most MSME factories, production planning is informal. Orders come in, someone decides what to run, the floor reacts. When materials are short, production stops. When machines break, deliveries slip. When the shift changes, information is lost. The result is a factory that runs on urgency rather than intention.

Service 5 of 6

From Firefighting to Flow

Production and planning systems create the structure that converts reactive manufacturing into predictable delivery. Not by removing flexibility — but by building the discipline that allows flexibility to operate within a reliable framework.

  • Production planning is formalised — orders are scheduled, capacity is mapped, and the floor knows what to run and in what sequence
  • Material requirements are planned ahead — shortages are visible before they stop production, not after
  • Shift handover is structured — information does not disappear when people change
  • Production performance is tracked daily against plan — variance is visible and acted upon before it compounds

What You Get

A production and planning system that gives the floor clarity on what to make, when, and with what — and gives management visibility on whether it is happening. Fewer delays, fewer surprises, and delivery performance that can be promised with confidence.

We work on-site with MSME manufacturers in Vadodara and its industrial estates — Makarpura, Waghodia, Por, Manjusar, Nandesari and Halol — from our office in Manjalpur, and with manufacturers across India. Where we work

Also on-site: 5S & Shop Floor Workshop

Production System Design Covers

  • Order-to-production scheduling process design
  • Capacity planning and load balancing methodology
  • Material requirement planning linked to production schedule
  • Shift planning and daily floor allocation systems
  • Shift handover format and information transfer protocol
  • Daily production vs plan tracking and review
  • Bottleneck identification and throughput improvement
  • Stores and inventory linkage to production planning
  • Delivery commitment and customer communication systems

When to call us

Signs your factory needs production planning

  • Orders come in and the floor reacts
  • Production stops when materials run short
  • Information is lost at every shift change
  • Delivery dates are promised on hope rather than capacity

How we work

We build it with your team, and stay until it runs

Diagnose before prescribing

We arrive with the right questions, not a pre-built solution. We listen to what the business is actually telling us.

Build the framework together

SOPs, KPIs and reporting structures, built with the people who will run them. Ownership transfers from day one.

Stay through implementation

We stay present through execution, adjusting in real time, holding accountability and solving what surfaces on the floor.

Exit when the team runs it

We leave only when your people are running the systems without us. That is the only measure of success we accept.

See our full consulting process

Common questions

Questions about production planning

Will a planning system make us less flexible?

No. Production and planning systems do not remove flexibility. They build the discipline that allows flexibility to operate within a reliable framework.

Does this cover stores and purchase?

Yes. Material requirement planning is linked to the production schedule, and stores and inventory are linked to planning, so shortages are visible before they stop production.

How is daily performance tracked?

Production is tracked daily against plan, so variance is visible and acted upon before it compounds.

Related services

One integrated engagement

Our services are not sold as standalone modules. Every engagement is designed as an integrated programme — because operational problems do not exist in isolation, and neither do their solutions.

Talk to Deepak about production planning

Every engagement begins with a conversation, not a sales pitch. Deepak personally responds within 24 business hours.