What KPIs should a production supervisor have?

A production supervisor should be measured on five things: how closely the shift followed the plan, how well the main machine was used (OEE), how much was rejected, safety and 5S in the area, and the people in the team. Each KPI needs a written formula, a source report and a monthly review.

Most factories judge a supervisor by feel. If the owner walks past and the machines are running, the supervisor is "good". If a customer calls about a late order, he is "bad". That is not fair to the supervisor, and it does not improve the shift.

A KPI (key performance indicator) replaces the feeling with a number that everyone can see.

Start from the role, not from the numbers

KPIs come last, not first. The order is:

  1. Job description (JD): what the position is for, its responsibilities and its authority.
  2. KRAs (key result areas): the four to six results the role is accountable for, with a weight for each.
  3. KPIs: the measure, the formula and the report for each KRA.
  4. Monthly review: the supervisor and his manager look at the numbers together.
  5. Yearly performance review: the monthly reviews add up to the appraisal and the increment.

A useful purpose line for a shift supervisor's JD is: plans and supervises the shift to the plan, to the drawing, and with the least loss. Every KPI below comes from that one line.

From job description to incrementFrom job description to increment: 1. Job description (The role in writing); 2. KRAs (Five result areas with weights); 3. KPIs (A number with a formula); 4. Monthly review (Facts checked every month); 5. Yearly review (The whole year looked at); 6. Increment (Decided from the review)1JobdescriptionThe role inwriting2KRAsFive resultareas withweights3KPIsA number witha formula4MonthlyreviewFacts checkedevery month5YearlyreviewThe whole yearlooked at6IncrementDecided fromthe reviewFrom job description to incrementFrom job description to increment: 1. Job description (The role in writing); 2. KRAs (Five result areas with weights); 3. KPIs (A number with a formula); 4. Monthly review (Facts checked every month); 5. Yearly review (The whole year looked at); 6. Increment (Decided from the review)1Job descriptionThe role in writing2KRAsFive result areas with weights3KPIsA number with a formula4Monthly reviewFacts checked every month5Yearly reviewThe whole year looked at6IncrementDecided from the review
From job description to increment

The five KRAs, with example weights

KRAExample weightWhy it matters
Plan adherence25%The customer's date depends on the shift doing what was planned
Main machine OEE20%The bottleneck machine decides the output of the whole plant
Rejection20%Every rejected part costs material, machine time and a delay
Safety and 5S15%An unsafe or untidy area loses time every day
People20%A supervisor's real job is to make his team better

These weights are an example. Each company sets its own, and they can change from year to year as priorities change.

The KPIs, with formulas

KPIFormulaSource report
Plan adherence %Quantity made as per plan ÷ quantity planned × 100Daily plan vs actual
OEE % of the main machineAvailability × performance × qualityDowntime record and production report
Rejection %Rejected quantity ÷ quantity produced × 100Rejection and rework register
Safety and 5SNear-misses reported, accidents (target zero), 5S audit scoreAccident and near-miss register, 5S audit
PeopleAttendance %, skill matrix cells filled, training hours givenAttendance register, skill matrix

A KPI that nobody reviews is just a number on a sheet. The monthly review is what makes it a KPI.

Five mistakes to avoid

  • Too many KPIs. Ten measures means none of them gets attention. Keep five or six.
  • No formula. "Good quality" is not a KPI. "Rejection % = rejected ÷ produced × 100" is.
  • New paperwork just for the KPI. Use the daily reports the plant already fills. If the report does not exist, fix the report first.
  • Measuring what the supervisor cannot control. If material arrives late from purchase, the shift's plan adherence will drop. Record the delay reason, so the review is fair.
  • Numbers without a review. Fix a date every month when the supervisor and his manager sit together for 30 minutes with the numbers.

How to start in your plant

  1. Write the supervisor's JD on one page, with the purpose line.
  2. Agree the five KRAs and their weights with the supervisor, not for him.
  3. For each KPI, write the formula and name the report it comes from.
  4. Check that the daily reports are filled correctly for one month before you set targets.
  5. Then set the targets, and review every month.

The first month is always messy, because the daily entries are not yet right. Fix the input before you trust the output.

Key points

  • Measure a production supervisor on plan adherence, OEE, rejection, safety and 5S, and people.
  • Build the KPIs from the job description, through the KRAs.
  • Every KPI needs a formula, a source report and a monthly review.
  • Keep it to five or six KPIs, using reports the plant already fills.
  • Fix the daily data entry before setting targets.

Questions owners ask

How many KPIs should a production supervisor have?

Five or six at most. More than that and nobody reviews them all each month, so none of them drive action.

Where does the data for supervisor KPIs come from?

From the reports the plant already fills every day, such as the daily production plan vs actual, the rejection register, the downtime record and the attendance register. No KPI should need extra paperwork.

Should the supervisor's KPIs be linked to increments?

Yes, through a monthly review and a yearly performance review. The KPIs show the facts; the review turns them into a fair discussion.

Written by Deepak B. Gondkar

Principal Consultant & Founder, SAI Industrial Consultant

Deepak B. Gondkar founded SAI Industrial Consultant in 2015. He brings 34+ years of industry experience and 11+ years of active consulting, and works on-site with MSME manufacturers in Vadodara and across India.

Want KPIs that your supervisors understand and your managers actually review? Start a conversation with us.

Start a Conversation
Back to Insights