Cost of Poor Quality: How to Find What Bad Quality Really Costs You

5 min readBy

What is the cost of poor quality?

The cost of poor quality is the money you lose because things were not made right the first time. It includes scrap, rework, sorting, returns, replacement, extra freight and lost orders. It is found in two places: inside your plant before dispatch, and at the customer after dispatch.

Ask an owner "how many pieces were rejected last month?" and he can often tell you. Ask "how many rupees did that cost?" and the room goes quiet.

Counting pieces is the first step. Counting rupees is the second. Until the number is in rupees, quality will always lose the argument against production targets and other spending.

What are the four kinds of quality cost?

Quality cost has four parts. Two are money you choose to spend. Two are money you lose.

KindWhat it meansExamples
PreventionSpent to stop defects being madeFirst-piece approval, training, mistake-proofing, supplier development
AppraisalSpent to find defectsInspection, gauges, calibration, testing
Internal failureLost when a defect is found before dispatchScrap, rework, sorting, machine stopped for a quality problem
External failureLost when the customer finds the defectReturns, replacement, freight, credit notes, penalties, lost orders

The cost of poor quality is the last two rows added together. The cost of quality is all four rows.

Note the difference between the first two. Appraisal finds defects. Only prevention stops them. A plant that answers every complaint with more inspection pays more every month and still makes the same defects.

The four kinds of quality costThe four kinds of quality cost: 1. Prevention (Spent to stop defects); 2. Appraisal (Spent to find defects); 3. Internal failure (Lost before dispatch); 4. External failure (Lost at the customer)1PreventionSpent to stop defects2AppraisalSpent to find defects3Internal failureLost before dispatch4External failureLost at the customerThe four kinds of quality costThe four kinds of quality cost: 1. Prevention (Spent to stop defects); 2. Appraisal (Spent to find defects); 3. Internal failure (Lost before dispatch); 4. External failure (Lost at the customer)1PreventionSpent to stop defects2AppraisalSpent to find defects3Internal failureLost before dispatch4External failureLost at the customer
The four kinds of quality cost

Why is the real number bigger than we think?

The accounts show only the tip. Scrap sold, credit notes and penalties are easy to see. The larger part sits under the water, spread across salaries, overtime and freight.

Look for these hidden costs:

  • Time spent sorting and re-inspecting.
  • Machine time lost, and overtime to catch up.
  • Express freight to make up for a late delivery.
  • Extra stock kept "just in case".
  • Management time on phone calls and meetings about complaints.
  • Orders lost, and trust lost.

Trust never appears in any account. It is still a real loss.

The later a defect is found, the more it costs. A defect caught at the machine costs a few minutes. The same defect found in final inspection costs the whole job. Found at the customer, it costs the job, the freight, the replacement and the relationship. Catch it at the machine, not at the customer.

A worked example, month by month

This is an example for a small machine shop. The figures are made up to show the method.

Sales for the month are Rs. 12,50,000.

ItemRs.
Scrap (internal failure)18,900
Rework (internal failure)7,200
Sorting a lot (internal failure)3,600
Returns and freight (external failure)6,000
Replacement parts (external failure)1,800
Inspection and gauges (appraisal)25,500
Training and first-piece approval (prevention)2,000

Now add them:

  • Internal failure: Rs. 29,700.
  • External failure: Rs. 7,800.
  • Cost of poor quality: Rs. 37,500, which is 3.0% of sales.
  • Total cost of quality: Rs. 65,000, which is 5.2% of sales.
  • Prevention is only about 3% of the total.

Two things stand out. Scrap alone is half of the loss. And the plant spends more on finding defects than on stopping them.

You cannot manage a loss you have not put a rupee value on.

How do we make the number every month?

  1. List the cost items. Use the four kinds above. Twenty or so items are enough for a machine shop.
  2. Give every item a source. Scrap comes from the rejection report. Returns come from the complaint register. Overtime comes from the salary sheet. Anyone should be able to check the number.
  3. Ask accounts to join. Numbers are believed when accounts has helped to make them.
  4. Use estimates where needed. A rough rework cost is time spent multiplied by the machine rate per hour.
  5. Show it as a percentage of sales. This lets you compare month with month.
  6. Pick the biggest item first. Use a Pareto chart, which puts the largest loss on the left. Work on that one before the others.
  7. Move money toward prevention. If first-piece approval costs little and removes a scrap item, it pays for itself fast.

Never use this number to blame a department or a person. The aim is to see where the system loses money.

How to start in your plant

Take last month. Write the ten biggest quality costs, in rupees, with the source of each. Rank the top three. Name one cost that nobody counts today. Then choose one prevention action for the biggest item.

This takes about one hour with your quality head and your accountant. The first list will be rough. That is fine. Fix the input not the output, and the numbers get better each month.

Key points

  • Cost of poor quality is internal failure plus external failure, counted in rupees.
  • The visible cost is only the tip. Sorting, overtime, freight and lost trust sit below.
  • Appraisal finds defects. Only prevention stops them.
  • Start with estimates and with the help of the accounts team.
  • Review the number every month and attack the biggest item first.

Questions owners ask

What is the difference between cost of quality and cost of poor quality?

Cost of poor quality is what you lose through failures, inside the plant and at the customer. Cost of quality is that loss plus what you spend on prevention and checking.

Do we need exact figures to start?

No. An approximate figure this month is worth more than a perfect figure next year. Start with estimates, then improve them with help from the accounts team.

Where should we start looking for the cost?

Start with scrap and rework, because they are easy to count. Then add sorting, extra freight, overtime and customer returns.

Written by Deepak B. Gondkar

Principal Consultant & Founder, SAI Industrial Consultant

Deepak B. Gondkar founded SAI Industrial Consultant in 2015. He brings 34+ years of industry experience and 11+ years of active consulting, and works on-site with MSME manufacturers in Vadodara and across India.